Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Stillwater Drive

Location

Manchester

Client

Scanlans Property Management

Type

Principle Contractor Project

Stillwater Drive

Introduction

The Stillwater Drive Re-clad Project was completed post Grenfell due to the existing cladding and render structures identifying as areas of concern. Cubic Facades were appointed as principal contractor to remediate the building to the correct fire standards.

Principal Contractor 

As the principal contractor to the project, we completed the following tasks.

  • Planning – Working with local authority to get a sympathetic solution to the visual design of the building, but to conform with building control regulations. As an example of this, we worked with the manufacturer of the cladding panel to create a special colour to match the existing façade.
  • Design and CDM – We designed a full set of construction drawings to undertake the scope of work, this also included a temporary working environment which was safe for the residents and a safe working site for our employees.
  • Site Set Up – Our site was fully equipped with cabins, offices, canteens, signage, and scaffold. Each day we had up to 40 staff members present on site.
  • Fire Design – part of the fire remediation work is to design a fire strategy with products that comply with current building regulations and to achieve EWS1 certification.
  •  Building Control – Liase with building control to achieve a building that conforms with all current regulations.
  • Golden Thread – We constantly monitor with QA along with a fire inspector by a qualified fire engineer and building control officer to create an electronic document to store all the project as built information.

Scope of works

New render system – Once we removed the existing non–fire rated render products, we installed a new VPI render system to achieve an A1 fire rating.

Terracotta Tile: We installed a new terracotta system including A1 rated rockwool insulation and new fire barriers due to nonconformance of the existing insulation within the cavity and the lack of fire breaks.

Rainscreen facade: We installed a new rainscreen panel system with rockwool insulation and firebarriers due to the nonconformance of the existing system which included a none fire rated rainscreen panel and combustible insulation along with a lack of firebarriers.    

Balcony Removal: The old timber decking was stripped and replaced with envirobuild A2 aluminium decking.

Firebreaks: Working with a fire engineer we designed the lay out for both horizontal and vertical firebreaks to ensure a suitable burn time for evacuation in the event of a fire.

Finally, we replaced all window reveals with new 2mm PPC aluminium standard detail profiles. 

From the initial assessment to the final installation, every step of the project was executed with precision, ensuring the seamless transformation of the building’s exterior while prioritising the safety and well-being of its occupants.

Through the removal of outdated cladding materials and the integration of modern, fire-rated solutions, we have not only rectified past deficiencies but also ushered in a new era of fire safety at Stillwater Drive. By incorporating vertical and horizontal fire breaks, we have fortified the building’s structural integrity, creating a robust network of barriers that mitigate the spread of fire and enhance occupant safety.

The success of the project is a testament to the collaborative efforts of all stakeholders involved, from architects and engineers to subcontractors and suppliers. By fostering open communication, innovation, and prioritising safety at every turn, we have achieved a remarkable transformation that stands as a beacon of excellence in the construction industry.

As the reclad project draws to a close, we reflect with pride on the impact it will have on the community and the lasting legacy it leaves behind. Stillwater Drive now stands as a shining example of fire-safe design and construction, setting a new standard for building resilience and occupant safety in Manchester and beyond.

In closing, we extend our heartfelt gratitude to all who contributed to the success of the project. It is through our collective dedication and unwavering commitment to excellence that we have achieved this remarkable feat, ensuring that Stillwater Drive remains a safe and secure haven for generations to come.